NaturePulse

SciencePulse · Space & Astronomy

Odysseus: The First Commercial Spacecraft Lands on the Moon

On 22 February 2024, Intuitive Machines' Odysseus lander touched down near the Moon's south pole — the first privately built spacecraft to soft-land on the Moon, and the first US landing since Apollo 17 in 1972.

The 2024 first commercial soft landing on the Moon, by Intuitive Machines' Nova-C lander Odysseus.

For the curious

For the first time ever, a company's robot spaceship — not a country's — landed on the Moon! It was called Odysseus, and even though it tipped over onto its side when it landed, it kept talking to Earth and doing science.

For students

Odysseus (a Nova-C lander by Houston company Intuitive Machines) landed near the crater Malapert A. After a navigation-sensor glitch, engineers reprogrammed it in orbit to use an experimental NASA laser instrument instead. The landing was hard — a leg snapped and it tipped sideways — but all six NASA science payloads returned data for about a week.

Going deeper

The mission (IM-1) flew under NASA's CLPS programme, which buys lunar delivery as a service from companies rather than building landers in-house. Payloads studied radio noise, plume-blown dust and landing precision — groundwork for Artemis crewed missions. A second CLPS lander, Astrobotic's Peregrine, had failed weeks earlier, showing how hard commercial lunar delivery remains.

For experts

IM-1 proved the CLPS model could reach the surface at a fraction of traditional mission cost (~$118M contract), albeit with reduced margins — Odysseus survived one lunar day only. Intuitive Machines' follow-up IM-2 (March 2025) also tipped over in a shadowed crater, underlining that precision polar landing is the industry's next big engineering test.

Common misconceptions

  • Odysseus wasn't a NASA spacecraft — NASA bought a ride; the lander was built and flown by a private company.

Sources

← Research & learning